Work has commenced to dredge out the silted up Central Dry dock at the mouth of the River Hull. Humber Workboats have placed a small cutter suction dredger in the dock, the gates that were left slightly ajar allowing the tides to silt the basin up have been sealed with two piles. River water is being pumped into the dock to allow the dredged silt to be flushed into the river.