Spooling

Postby creemaster » Wed Apr 11, 2018 2:47 pm

Taking place this week at Battleship Wharf, MAERSK CONNECTOR taking on sub sea cable from the bulk carrier GLOBAL ROUND.
GLOBAL ROUND arrived last Friday from Singapore and was down in the South Harbour until Sunday when she was moved up to Battleship.
GRAND CANYON moved over and has been stern on to the quay since early Monday morning, before MAERSK CONNECTOR arrived at 8.00am.
Presume GRAND CANYON is part of a seperate operation, and has not adopted the motto 'they shall not pass'
Spooling is due to be completed by the weekend, depending on weather, see the link to the port's notice to mariners.

http://portofblyth.co.uk/wp-content/upl ... ration.pdf

GRAND CANYON must be moving soon as BANIER is due shortly to load rdf for Sweden

Regards
Graham

spooling operation.JPG

grand canyon stern to.JPG
creemaster
 
Posts: 2317
Joined: Mon May 14, 2012 5:53 pm

Re: Spooling

Postby creemaster » Sat Apr 14, 2018 5:32 pm

As promised some better pictures take today
Regards
Graham
Attachments
spooling operation 2.JPG
7 am on the way to work. Connector's P/A system disturbing the locals
spooling operation 3.JPG
but what are these for ???
spooling operation4.JPG
4 PM work done n heading home
spooling operation 5.JPG
little orange men now on them and bashing them
spooling operation 6.JPG
close up of the cable
creemaster
 
Posts: 2317
Joined: Mon May 14, 2012 5:53 pm

Re: Spooling

Postby creemaster » Sat Apr 14, 2018 5:34 pm

ok got the caption wrong way round
Regards
Graham

spooling operation 5.JPG
close up of the cables

spooling operation 6.JPG
little orange men bashing them
creemaster
 
Posts: 2317
Joined: Mon May 14, 2012 5:53 pm